A main floor reconsidered for staying put

A main floor reworked so the second story becomes optional.

A main-floor bedroom with a level threshold and a widened doorway.

What we did here

The brief was one sentence: we are not moving. Everything else followed from that. A main floor with a bedroom, a full bath, a laundry and a level entry, so the second story becomes optional rather than necessary.

Doorways widened where the framing allowed, and where it did not we said so instead of promising it. One opening carries a point load that would have needed a beam and a new footing to widen, and the honest answer was that three inches was not worth what it took.

A 1968 house means federal lead-paint work practice throughout, including at every window and door opening we touched. Containment, specific cleaning, and verification affect both the schedule and the number, and both were in the proposal.

  • The main-floor bath with a curbless shower and no visible modification.
  • The level entry from the driveway side, with no step at the door.
  • Detail of a wall showing blocking behind the finished surface at grab-bar height.

A house from 1968

Federal lead-paint rules governed every disturbed painted surface on this project — containment, specific cleaning and verification, written into the fixed-price proposal rather than discovered halfway through.

What the lead-paint rules require, in full

The brief was one sentence: we are not moving. Everything else followed.

Something like this?

Tell us about your house. Four short steps, and it ends with a call from Priscilla within one business day.

  1. The project
  2. The house
  3. Tell us
  4. You
What you're thinking about
Which rooms are you thinking about?

Choose up to three. If it is genuinely everything, say so in the description on step three and we will take it from there.

0 of 3 chosen.

How far does it go?
CallStart a conversation